CONSIDERED SOLAR & BATTERY TOOLKIT

G98 / G99 Submission Generator

A DIY organising aid: fill in your installation details once and get a draft submission summary and system diagram — the same information your DNO's notification or application form asks for, laid out so you can check it, print it, or hand it to your installer. It's here to save you re-typing the same details across a form and a diagram — not to verify, certify or design your system for you.

✓ Everything runs and stays in your browser — nothing is sent to Considered or stored anywhere ✓ Builds a system schematic automatically from the equipment you list ✓ A DIY drafting aid, not a compliance check, verified submission or system-designer replacement
Submission Generator v1.3.1 Added August 2026 Release notes
Private by design. Everything you enter — your address, MPAN, installer details and equipment — stays in your browser. It is not sent to Considered, stored on our servers, or used for analytics. There's no account and no save option in this version, so refreshing or closing this tab clears everything. No data leaves your browser at any point.

1. WHICH REGISTRATION ARE YOU DOING?

2. YOUR DETAILS

3. INSTALLER DETAILS

Needed for the installer declaration section of the notification. If you're DIY, note your own accreditation status (if any) or leave blank — check with your DNO whether a self-install is accepted for your setup.

4. YOUR GENERATION & STORAGE EQUIPMENT

Add each source separately — solar array, battery, wind turbine, EV charger (if it can export/V2G) or other generation. This also drives the diagram below. If more than one distribution board is involved (a garage/annex consumer unit, for example), say which one each item feeds — the diagram will draw them separately. If two items plug into one physical inverter (a hybrid solar+battery inverter, for example), add the inverter's own item first, then use "Shares an inverter with" on the second one — its capacity won't be double-counted, and the diagram will show one shared inverter box.

ADD EQUIPMENT

5. EXPORT LIMITATION SCHEME (OPTIONAL)

Only fill this in if your installation uses a Customer Limitation Scheme under ENA G100 — a device or system that automatically caps your total export (and/or import) below what your equipment could otherwise produce, so a larger system can connect without full network reinforcement. Most straightforward G98 notifications won't have one of these; leave it unchecked if you're not sure.

Your equipment vs. the thresholds

A cross-check against the same G98/G99 thresholds used in the standalone checker.

Combined AC capacity, largest phaseSum of everything on your busiest phase
Threshold that applies3.68kW single-phase · 11.04kW three-phase
SuggestsBased on your equipment list above

System schematic

Auto-generated from your equipment list — the block-diagram style DNOs ask for alongside a G98 notification. Groups equipment by consumer unit if you've named more than one, draws a single shared inverter box where you've said two items plug into one hybrid inverter, and shows your G100 limitation device (if you added one) between the meter and the DNO network. Still simplified: if your actual wiring differs from what's captured here, note that below rather than relying on this alone. Assumes a single grid connection point/meter — if part of the property genuinely has its own separate supply, treat that as a separate submission.

Submission summary

Equipment
A note on how to read this This is a DIY organising aid, built to help you gather and lay out your own submission — it is not a verified or compliant submission, a compliance check, or a replacement for a qualified system designer. It doesn't check your inverter against the live ENA Connect Direct device register, doesn't verify your setup complies with G98/G99 or any other standard, doesn't submit anything to your DNO on your behalf, and doesn't replace an installer's signed declaration on a G98 Form B or a qualified engineer's single-line diagram for a G99 application. Requirements and forms change and vary by DNO — always check the current version against your own DNO's guidance before sending. For G99 in particular, DNOs generally expect a formal single-line diagram with protection and fault-level detail, produced or checked by a qualified engineer; the schematic this tool generates is a starting point for that conversation, not a substitute for it.

Common mistakes this tool tries to avoid

How this works, and where to send it

G98 vs G99. G98 covers micro-generation up to 3.68kW per phase (single-phase) or 11.04kW per phase (three-phase) combined AC export capacity — installed first, then notified to your DNO within 28 days via Form B. G99 covers anything above that, and needs formal DNO approval before you install. This tool cross-checks your equipment list against those thresholds the same way the standalone G98/G99 Export Limitation Checker does, and flags if what you've picked in step 1 doesn't match what your equipment adds up to.

The submission summary. Pulls together the fields a G98 Form B (or the equivalent domestic-scale G99 application) actually asks for: customer and installation details, your MPAN, installer/accreditation details, and equipment specifics including AC rating, phase and the ENA Type Test reference. Use the "Print / save as PDF" button to get a clean copy to check, sign, or attach.

The diagram. Built automatically from your equipment list: each item becomes its own source box, then converges into an inverter/converter and AC isolator — one inverter box per physical inverter, so two items you've marked as sharing one hybrid inverter converge into a single box rather than being drawn as two separate inverters — grouped by consumer unit if you've named more than one, converging into a shared meter and DNO connection (with your G100 limitation device shown in between, if you added one). This deliberately mirrors the simple "system schematic" DNOs ask for alongside a G98 notification. It's still a simplification: if your real wiring is different from what's captured here, use the diagram notes field to say so rather than relying on the auto-layout alone. It also assumes one shared grid connection point — a genuinely separate supply (its own meter) is a separate submission, not something this diagram represents. For a G99 application specifically, DNOs generally expect a more detailed, professionally-produced single-line diagram with protection and fault-level information — this schematic is a solid starting point for that conversation with your installer or engineer, not a replacement for it.

G100 export limitation. If you've told the tool your installation uses a Customer Limitation Scheme (ENA G100), the summary and diagram record the agreed limit, the device and its type-test status, and which G100 issue applies — Issue 2 Amendment 2 (2023) has been mandatory for installations commissioned since 1 May 2023. A G100 scheme caps actual export/import at the connection point; it doesn't automatically determine your G98/G99 registration tier — some DNOs size a connection against the agreed limit rather than the equipment's full rating, but that's their decision to confirm, not this tool's.

Where to send it. Many DNOs now accept G98 notifications through the ENA's shared Connect Direct portal; some still want their own form by email or post, and G99 applications are generally handled directly by your own DNO. Check the "where to send this" section for your DNO's contact details, and confirm the current submission route on their website before sending — this changes from time to time.

What this doesn't do. It doesn't check your inverter against the live ENA Connect Direct device register, doesn't know your specific DNO's current online portal requirements in detail, doesn't calculate protection settings or fault levels, and doesn't submit anything on your behalf. It also doesn't yet support Form A (multi-installation developments) or non-domestic G99 tiers (Type B and above), which need a fuller technical study.

Release notes and version history
v1.3.1
Fixed the diagram/summary cards actually staying white after the last update

The diagram and Submission Summary cards are deliberately light (they preview how the page prints) rather than dark like the rest of the page, but after switching them from pure white to a softer grey, the change wasn't showing up — two separate mistakes stacked on top of each other. First, the initial grey chosen was too close to white to read as a change at all on most screens; picked a clearly distinct grey this time. Second, and more importantly: the stylesheet was updated but its cache-busting version number wasn't, so browsers kept serving the old cached stylesheet even after the new one was uploaded — the page's HTML was up to date while its CSS quietly wasn't. Every asset reference (stylesheet, logo, script) is bumped together in this release specifically to rule that out.

v1.3
Hybrid/shared inverter support, and a dark-theme checkbox fix

Prompted by a follow-up question: "does the tool allow batteries and PV array to connect into one inverter (in the case of a hybrid one)?" It didn't — every equipment item was treated as having its own inverter, so a shared hybrid inverter's AC rating would get counted twice against the G98/G99 threshold. Added a "Shares an inverter with" option on each equipment item: pick another item that's already in your list, and its own inverter/manufacturer/model/AC-rating/Type-Test fields hide (they're inherited from the item it shares with) so there's nothing to fill in twice or get out of sync. The threshold check and the diagram both now treat shared items as one physical inverter — one AC rating counted once, one inverter/isolator box drawn once, fed by both source boxes. Also fixed a display bug reported directly: the G100 and land-ownership checkboxes were rendering as plain white boxes against the dark theme (missing color-scheme: dark, so the browser fell back to its light-mode default widget) — now styled consistently with the rest of the page.

v1.2
Added G100 export limitation and multiple consumer units

Two additions, both prompted by follow-up questions: an optional "Export limitation scheme (G100)" step for installations using a Customer Limitation Scheme (agreed export/import limit, device details, type-test status, G100 issue), shown in the summary and as its own box in the diagram between the meter and the DNO network; and an optional "consumer unit / distribution board" field on each equipment item, for properties with more than one board (a garage or annex, for example) — the diagram now draws one consumer-unit box per named board, each still converging into a single shared meter and DNO connection. Diagram assumes one shared grid connection point throughout; a genuinely separate supply needs its own submission.

v1.1
Fixed diagram source/inverter mix-up

The system schematic was showing your entered manufacturer/model on the source box (solar array, battery, etc.) and a generic label on the inverter box — backwards, since manufacturer/model, AC rating and the Type Test reference all describe the inverter/converter, not the panels or turbine themselves. The source box now shows a generic label (plus DC array size for solar), and the inverter box carries your entered manufacturer/model. Also clarified the form field labels to say "inverter / converter manufacturer" and "inverter / converter model" so this doesn't happen again.

v1.0
Initial release

Guided G98 notification / G99 application summary generator with a repeatable equipment list, automatic threshold cross-check, an auto-generated system schematic (downloadable as PNG/SVG), a printable submission summary, and DNO contact details. Form A (multi-installation developments), non-domestic G99 tiers and a live ENA Connect Direct device register check are not yet included.